13.10.2023
Cleaning the pool and replacing the drain pipe
Renovation work has been carried out on the sewage pipe leading to our catchment basin. The pipe had shown some signs of weakness this summer. To prevent a possible leak, the entire pipe was replaced.
At the same time, the basin was completely emptied and thoroughly cleaned. When the retention basin is full, the wastewater is sent directly to the treatment plant.
We’re very satisfied with the work carried out by Dieudonné Terrassement, a company based in Le Thillot: a team of conscientious employees who did a very thorough job! We’d like to thank them!